Roofer Job Guide

Find a Roofer for I need a roofer

From quick patch to replacing a roof section, a roofer's visit can include diagnosis, minor repairs or larger replacement depending on access and materials.

Scope-matched providers

Matched providers are filtered for this job type.

Fast estimate flow

Get a scoped range before you post your job.

Compliance documentation

Quote responses can include required compliance notes.

3,239 local providers4.6 avg ratingTypical duration: 2-6 hours

What we'll ask you

4 quick questions for your estimate

Answer these and we’ll generate a personalised range in seconds before you post your job.

Pricing guide

Costs vary mainly with whether the visit is a diagnostic and minor repair or a full section replacement that involves tear-out, new underlay and flashing. Access needs (scaffold or EWP), heritage or tile-matching work, multi-person labour and coordination with other trades typically increase complexity and duration. If hazardous materials or specialist remediation are identified, additional specialist quotes and licences may be required and can further affect overall cost.

  • Extent of work required

    Minor on-the-spot repairs are typically much simpler than tear-out and section replacement which adds labour and materials.

  • Roof material and heritage sensitivity

    Tile or slate roofs that need careful matching or delicate re-bedding usually require more time and may have longer lead times for matching materials.

  • Site access and equipment needs

    Where safe ladder access isn't available and scaffold or an elevated work platform is needed, setup and removal add time and complexity.

  • Crew size and trade coordination

    Jobs that need multi-person labour or coordination with carpentry or leadwork typically take longer and involve more planning.

  • Hazardous materials and remediation

    If hazardous materials are found, specialist remediation and additional licences or quotes may be required, increasing scope.

I need a roofer

Estimated range

$375 – $1,235

Default scope: A couple of related issues or one part of the roof

What moves this estimate

  • Extent of work required: Minor on-the-spot repairs are typically much simpler than tear-out and section replacement which adds labour and materials.
  • Roof material and heritage sensitivity: Tile or slate roofs that need careful matching or delicate re-bedding usually require more time and may have longer lead times for matching materials.
  • Site access and equipment needs: Where safe ladder access isn't available and scaffold or an elevated work platform is needed, setup and removal add time and complexity.
  • Crew size and trade coordination: Jobs that need multi-person labour or coordination with carpentry or leadwork typically take longer and involve more planning.

Local results

Active providers

3,239

Average rating

4.6

  • We recently had our roof restored by Beau and couldn’t be happier with the result. The transformation from federation red to monument grey has completely modernised our home and m…

    Ann-Margaret Rooney

  • Jim and Michael arrived promptly and provided a detailed quote. Then the crew of Jason,Michael and Dillon arrived to carry out the work which was completed promptly to an excellen…

    Daryl Bell

  • awesome work and tradie crew! appreciate the dedication, focus and simply in awe that the crew completed the works timely . and cleared up the property and left it tidy . will rec…

    sahra rose Mahya

How it works

  1. 1

    Describe your job

    We ask targeted questions to scope your exact job.

  2. 2

    Get matched

    We match you with local providers for this job type.

  3. 3

    Compare and book

    Review quotes and choose the provider that fits.

Frequently asked questions

Do roofers need a licence?
Roofing work requires a qualified/licensed roofer. Licence types and requirements vary by state, so you should confirm the tradesperson holds the appropriate roofing licence for your location.
How long will my roof repair usually take?
A standard diagnostic visit and minor repair is often completed within a single visit and typically takes a few hours. Section replacements or heritage-sensitive repairs usually take longer due to tear-out, reinstatement and possible material lead times.
Will scaffolding or an EWP be required?
If safe ladder access isn't available or the work area is high or difficult to reach, scaffold or an elevated work platform is often needed. Your roofer will usually advise whether this equipment is needed after assessing site access.
Can old tiles or slates be matched?
Matching existing tiles or slates often requires careful removal and sourcing of similar materials, which typically increases labour and may incur longer wait times for parts. For heritage or brittle tiles, specialists or more delicate techniques may be recommended to avoid collateral damage.
How accurate is the instant estimate?
Our estimates are built from research across thousands of local jobs and real pricing data. Use them as a guide when speaking to roofers — your actual quote will depend on your specific job.
How many quotes will I get?
We'll match you with up to 3 roofers initially. If you'd like more options, you can request additional matches.
Do I pay anything to get quotes?
No — the service is 100% free for homeowners.
Why do you need photos?
Clear photos cut surprises and price blowouts, saving you money.

Ready to compare quotes?

Start with an instant estimate and then compare local providers for this exact job.

Start My Quote
Trusted Tradies
Transparent Quotes
Fast Response Guarantee
100% Australian-Owned